Paint
We met with our painters to see samples of our exterior "squirrel", the main interior color "kilim beige" and trim color "designer white." They began painting exterior the following day, prepping inside and will begin interior on Monday, May 2.
Friday, April 29, 2011
Trim and Doors
Solid doors were hung on Saturday. We walked the house with the trim man to determine "crown, double crown, wrap, etc" and the crew started trimming that same day. More material was ordered to complete the job.
Friday, April 15, 2011
Sunday, April 10, 2011
Moving Along
The house is completely bricked with stone and finishing touches are being made with the metal roof over porch outside of dining room. Inside is fully sheet-rocked and walls have been textured. Wood floor installation will begin this this week. Then the cabinets will be set, stone work inside will be completed, stairs installed and trim work will begin. We hope to see painting begin the first week of May and last 10 days or so. Following painting, ceramic tile walls and floors and granite will be installed. Plumbing, HVAC and Electric will begin around last week of May. House should be done in early June if all goes as planned!
Subscribe to:
Posts (Atom)